Large projects of hospital waste management in different parts of Pakistan

large projects of hospital waste management in different parts of Pakistan.

To establish a centralized hospital waste treatment facility we need an integrated autoclaving system (preferably vacuum autoclave) to treat infectious hospital waste having capacity to handle 5 tons per day. The whole system would comprise of

Automatic Loading and offloading unit
Vacuum Autoclave complete with all standard accessories, steam boiler, instrument and control system, continuous sterilization monitoring system, stack gas monitoring and control system for boiler, etc…
Shredding unit
Compactor
Automatically cleaning and disinfection system
Freezing system

Kindly send us detailed technical and financial proposals encompassing

vertical autoclave factory

vertical autoclave factory

vertical autoclave sale

vertical autoclave

Capital Cost with breakups
Electricity requirement, fuel requirement, Manpower Requirement, Consumables requirement, and other operational requirements.
Area required for this facility.
Proposed Layout of treatment facility and basis process flow diagrams,
Conceptual literature on working of this facility.
Time required designing, fabricating, and supplying equipment.
Time required for installation and commissioning
Your offer should separately incorporate the cost, terms & conditions for supervision of installation, commissioning and training of operators.
Payment Terms & Conditions.